Residential

Residential Contractor Requirements

All forms must be completed and included with the 2 sets of construction plans submitted to the Engineering Department and Building Inspection Department for review. The Water Quality Specialist will review all grading plans to ensure that the site drainage conforms to the subdivision drainage plan and that appropriate erosion and sediment controls are in place to prevent pollutants from leaving the construction site.

  1. 1
  2. 2
  3. 3

Inspections

Contractors are responsible for scheduling the initial inspection with the Water Quality Specialist, prior to the start of construction, to verify the necessary stormwater pollution prevention best management practices are in place. Contractors are also responsible for scheduling the final inspection to verify proper stabilization exists following project completion (to be scheduled prior to final inspection with the Building Department).

Note

If the all of above information is not completed and submitted with construction drawings, the plan will not be allowed to be reviewed.

Helpful Documents

Additional Information

Visit the Building Inspection Division's page for additional information regarding construction.